Documents Approved Master PlanPlanning Board (October 12th, 2021) October 12th, 2021 Draft Plan (spreads, for printing)Download October 12th, 2021 Draft Plan (pages, for printing)Download Draft Plan Documents September 8, 2021 Draft Plan (pages, for printing)Download September 8, 2021 Draft Plan (spreads, for viewing)Download Existing Conditions Report (pages, for printing)Download Existing Conditions Report (spreads, for viewing)Download Draft Goals and Vision StatementDownload Place-based Land Use and Design StrategiesDownload Meeting Documents Steering Committee Meeting #5 (May 26th, 2021) Download Public Meeting #3: Scenarios and Recommendations (April 6th, 2021) Download Steering Committee Meeting #4 (Mar 24th, 2021)Download Steering Committee Meeting #3 (Feb 18th, 2021)Download Public-Meeting #2: Vision and Goals (Jan 6th, 2021)Download Steering Committee Meeting #2 (Dec 22nd, 2020)Download Public Meeting #1: Kick Off (Nov 5th, 2021) Download Steering Committee Meeting #1 (Sept 23rd, 2020)Download Previous Plans & Studies 2020 Nashua Housing Study Download 2020 Southern Tier CommunitiesDownload 2017 Downtown Riverfront Development Plan Download 2016 Complete Streets Guide Download 2012 Trees Streets Neighborhood Analysis Download 2004 East Hollis Street Area Plan Volume 2 Download 2004 East Hollis Street Area Plan Volume 1 Download 2003 Downtown Master Plan Download 2000 Master Plan Download